REFERENCES

Name of Executed
Works

Eriç Cascade Dams (No 4) and Hydroelectric Power Plants (282.53 MWe / 291.27 MWm), and 20 km Energy Transmission Line (154 kV)

SECTOR

Environmental Projects

TYPE

EIA/ESIA

LOCATION

Tekirdag/Lüleburgaz – Turkey

REFERENCES

Engineering and Design

Work Experiences

Services provided within the scope of the project:

  • 5Performing environmental and social baseline studies
  • 5Performing air quality dispersion modelling through AERMOD software including SO2 and NOx
  • 5Supervising project activities, public and authority relations
  • 5 Performing Institutional Communication
  • 5Preparation of Environmental Scoping Report
  • 5Preparation of Public Consultation and Disclosure Plan
  • 5Preparation of Environmental and Social Action Plan (ESAP)
  • 5Performing settlement and household questionnaire study
  • 5Preparation of ESIA Report in compliance with the requirements of international finance institutions

Performing Baseline Studies:

  • 5Freshwater and Groundwater Survey
  • 5 Surface Water Survey
  • 5Soil Quality Survey (autumn)
  • 5Noise Survey
  • 5Flora, Fauna, Aquatic Life Survey
  • 5Air Quality Survey (SO2, NOx, PM10, PM2.5, heavy metals in dust)

Deliverables of the Project:

  • 5Baseline Survey Reports
  • 5Acoustic Report
  • 5Final EIA Report
  • 5Air Quality Modelling Report
  • 5Final EIA Report
  • 5Air Quality Modelling Report
  • 5Environmental and Social Action Plan
  • 5Public Consultation and Disclosure Plan
  • 5Environmental and Social Action Plan
  • 5ESIA Report
Envy – An Assystem Company